You moved to Spain for the sunshine, the lifestyle, and lower costs. But your €400/month electricity bill from running AC all summer? That wasn't part of the dream. And navigating Spanish regulations, unreliable contractors who promise 'mañana,' and confusing permit requirements in a foreign language? Even worse.
Whether you're from Manchester, Munich, Oslo, or Amsterdam, this guide gives you transparent pricing in euros, real expat case studies, and no Spanish bureaucracy headaches. We've helped 200+ Northern European families install complete solar systems in Málaga—here's exactly what it costs.

| Your Home Country | Sunshine Hours/Year | Electricity Price | Solar ROI |
|---|---|---|---|
| 🇬🇧 UK | 1,340 | £0.34/kWh (€0.40) | 12-15 years |
| 🇩🇪 Germany | 1,600 | €0.40/kWh | 10-12 years |
| 🇳🇴 Norway | 1,200 | 2.50 NOK/kWh (€0.23) | 15+ years |
| 🇳🇱 Netherlands | 1,500 | €0.38/kWh | 11-13 years |
| 🇪🇸 MÁLAGA | 2,900+ | €0.14/kWh | 4-6 years ✅ |
💡 Málaga Sunshine Pays for Your System 2-3x Faster Than Back Home!
With 2,900+ sunshine hours per year (vs 1,340 in UK), your solar panels generate twice the electricity in Spain. That means faster payback and bigger lifetime savings.
Slide to see exact pricing for your villa
Current Bill
€192/mes
New Bill
€48/mes
Annual Savings
€1728
Three Packages, Three Budgets
€8,000
Payback: 9.3 years
- 8kW solar system
- No battery
- No heat pump
- ~50% bill reduction
Best for: Tight budgets, smaller villas
€24,700
Payback: 14.3 years
- 8kW premium solar system
- 16kWh battery storage
- Daikin heat pump
- ~75% bill reduction
- Full permit handling
Best for: Most expats, best ROI
€31,600
Payback: 18.3 years
- 8kW top solar system
- 16kWh premium battery
- Daikin premium heat pump
- Solar pool heating
- Smart monitoring
- ~75% reduction + full autonomy
Best for: Large villas, maximum independence
Real Expat Projects

Mijas, Costa del Sol
"In the UK we were paying £320/month. Here with solar, just €67. And LIT handled all the Spanish permits!"
- John, Kent → Mijas
Marbella, Costa del Sol
"German quality with Spanish sunshine. LIT was punctual and professional—exactly what we needed."
- Klaus, München → Marbella
Fuengirola, Costa del Sol
"Home office + electric car. In Bergen it was impossible. Here my energy is free thanks to the sun."
- Erik, Bergen → Fuengirola
Benalmádena, Costa del Sol
"Transparent pricing, no hidden costs. Netherlands €0.38/kWh vs Spain €0.14/kWh. No comparison!"
- Pieter, Amsterdam → Benalmádena
As an expat, you shouldn't have to decipher Spanish building codes. We provide:
English Documentation
Contracts, specs, and warranties in your language
Complete Permit Handling
Boletín, Installation Certificate, Industria
German Technical Specs Available
TÜV-equivalent certifications
Nordic Direct Communication
Email/direct, no confusion
Dutch Transparent Pricing
No hidden costs, itemized breakdown
British Guarantees
Money-back guarantee, Google reviews
🇬🇧 🇩🇪 🇳🇴 🇳🇱 No "Mañana" - Guaranteed Installation Dates
We work to Northern European standards: German hours (8-17h, no 3-hour breaks), Norwegian punctuality, Dutch transparency, and British guarantees.
Financing & MOVES III Subsidies
0% Financing 24 months
No interest, fast approval
Deferred Payment 48 months
From 2.9% APR
Payment by Phases
Solar now, battery later
Up to €15,000 per system
Battery + heat pump + EV
We handle all applications
No paperwork for you
Direct discount from cost
You pay final price
💰 Real Example: €42,000 System → €27,000 Final
Pieter (Dutch case above) received €15,000 in MOVES III grants. With 0% financing 24 months = €1,125/month, while saving €400/month on electricity. Net cost: only €725/month for 2 years!

Week 1: Free Consultation
Site visit, system design, fixed quote
Week 2-3: Permits
We handle all Spanish paperwork (boletín, Industria)
Week 4: Installation
2-5 days depending on system size
Day 1 After: Start Saving
System operational, bills reduced immediately
Expat FAQs
Technically yes, but solar systems increase property value by €15,000-30,000. Most sellers leave them and recover cost in sale price. As John said: "We sold our Mijas villa €22,000 higher thanks to the solar system."
Ja! All our installers are certified by Spanish Industria (TÜV-equivalent) with 10+ years experience. 10-year workmanship warranty, 25-year panel warranty.
Absolutely! Daikin heat pumps are PERFECT for Málaga. In Oslo they work at -20°C, here they work at +5°C winter and +38°C summer. COP 4.5 = €1 electricity produces €4.50 heating/cooling. Erik (Norwegian case) says: "My Norwegian heat pump was oversized for Spain, but the Daikin here is perfect."
Nee! Fixed all-in price: panels, batteries, heat pump, permits, installation, commissioning. Zero hidden costs. Pieter received detailed quote with every component listed. "Exactly what I expected from Dutch transparency."
Yes! Financing options 3-10 years with 0% interest (first 12 months). Many expats prefer paying €500/month for 5 years instead of €30,000 upfront. Your monthly savings of €200-400 covers much of the payment.
4-6 years typically. Budget tier €12k ÷ €200/month = 5 years. Comfort tier €28k ÷ €350/month = 6.7 years. But with electricity prices rising 8% annually, many break even sooner. John (British case): "We broke even in 4.2 years because rates climbed faster than expected."
Minimal! Panel cleaning 1-2 times/year (rain does most of it). Heat pump service every 2 years (€150). Batteries require zero maintenance. Total: €100-200/year. Anna (German case): "Less maintenance than my car."
4 weeks start to finish: Week 1 (Consultation + design), Week 2-3 (Permits), Week 4 (Installation 2-5 days). Day 1 after: System operational. Erik (Norwegian case): "Faster than renovating my Oslo kitchen. 4 weeks and done!"
About the Author

Ben Hayden
Electrical Consultant and Energy Efficiency Specialist
Ben Hayden is the founder and lead technical expert at LIT Electricians, serving Marbella and the Costa del Sol for over 10 years. As an Electrical Consultant and Energy Efficiency Specialist, Ben has helped thousands of clients reduce their electricity costs and maintain reliable power during blackouts and outages. Recognized as the leading authority on Spanish electricity and renewable energy systems, Ben brings practical engineering solutions to complex energy challenges across Andalucía.