Marbella · San Pedro · Mijas · Costa del Sol

EV Charger Installation in Marbella & Costa del Sol

Professional home, villa, apartment garage and business EV charging installations. Smart load management, solar compatibility and safe electrical integration, assessed for your property.

See our EV installations

Real projects. Clearly described.

San Pedro, Marbella · Orbis Viaris

San Pedro, Marbella · Orbis Viaris

A pedestal-mounted Orbis Viaris installation in San Pedro de Alcántara. See the existing project photographs and the installation context.

View project and photographs
Estepona · Tesla Wall Connector

Estepona · Tesla Wall Connector

A Tesla Wall Connector installed in a private garage in Estepona. A practical example of planning a dedicated home charging point.

View project and photographs
Calahonda, Mijas · communal parking make-ready

Calahonda, Mijas · communal parking make-ready

Electrical infrastructure prepared for a future charging point in an urbanisation. This is make-ready work; it is not presented as a completed or operational charger.

View project and photographs

Charging, properly planned

Your parking. Your supply. Your charging plan.

01

Homes & luxury villas

Charging where you park. We assess cable reach to the vehicle, wall or pedestal mounting, outdoor cable routes and the capacity of your supply.

Discuss this installation
02

Communal & underground parking

We assess the meter-to-bay route, shared containment and access. An individual private bay and a shared charging scheme need different plans.

Discuss this installation
03

Business & workplace charging

Plan users, number of charging points, available power and access, metering and connectivity needs before specifying equipment.

Discuss this installation
04

Smart charging & dynamic load balancing

Compatible controls can adjust charging power as other property loads change. Configuration depends on metering, the supply and agreed limits.

Discuss this installation
05

Solar-compatible charging

We check charger, inverter and metering compatibility before proposing surplus-solar charging. Not all equipment supports the same solar controls.

Discuss this installation
06

Upgrades & electrical assessments

We assess existing equipment, wiring, earthing, consumer unit and supply. A higher-rated replacement does not guarantee faster charging.

Discuss this installation

Your enquiry, in two steps

We do not save these details on the website. Review the message and send it yourself in WhatsApp.

Prefer to go straight to WhatsApp?

Step 1 / 2

What do you need?

Choose a service

Nothing is sent until you press Send in WhatsApp. Add photos there; do not open electrical covers or boards.

For air conditioning, heat pumps or Airzone: Agua Therm.

Local installation: choose your town

Mijas

From Mijas Pueblo to La Cala and Calahonda, start with the route between your electricity supply and your parking space. A private driveway and a space in an urbanisation need different plans.

Marbella

Plan charging for a villa driveway, a basement parking space or a shared development in Marbella, Nueva Andalucía or San Pedro de Alcántara. The right installation starts with the supply, not the charger badge.

Estepona

Home charging in Estepona needs to suit your garage, your vehicle and the power available at the property. We assess private garages and parking in apartment developments, including the New Golden Mile.

Assessment-based pricing

Request a Tailored EV Charger Installation Quote

Cable routing, available power and the existing installation determine the scope. Confirm a written quote before work is agreed; photos help with initial advice, but a site visit may be needed.

Supply and installation

Equipment selection and installation design matched to your vehicle, supply and parking space.

Customer-supplied charger

Installation quoted after checking the model, compatibility, condition and manufacturer requirements.

Communal, business or complex installation

Site-specific assessment of shared routes, load management, access and coordination. Individually quoted.

Your quote checklist
  • IVA: applicable tax rate, tax amount and final total clearly stated.
  • Equipment: charger model and included accessories, or exclusion for customer-supplied equipment.
  • Installation: cable length and route, containment, mounting and protective devices.
  • Handover: testing, setup and applicable documentation or registration.
  • Extras or exclusions: civil works, trenching, making good, board or supply changes, connectivity and software subscriptions.
  • Terms: access, community coordination, scheduling and responsibility for equipment and installation.

Before you install: your questions

Other areas: find your location

Start with your parking space

Tell us the town, property type, whether parking is private or communal, your car model and whether you already own a charger. Add photos of the bay, proposed route and the outside of the board or meter cabinet from a safe position.

Do not open electrical covers, remove panels or touch wiring. Do not enter restricted areas, and hide personal information.

    We Respect Your Privacy

    Optional visit and advertising measurement needs your permission. Change your choice anytime in the footer.