How to Install Solar Panels
Complete step-by-step guide to the solar installation process. From initial consultation to operating system in 4-6 weeks.
Process Overview
Solar installation takes 4-6 weeks total: 1-2 weeks for design and permits, 1-3 days for physical installation, 1-2 weeks for final inspection and grid connection.
Contact us for a free consultation. We'll assess your property, electricity usage, and energy goals.
What to Expect:
- Call +34 711 004 350 or complete our online form
- Provide recent electricity bills (last 3 months)
- Schedule a site visit at a convenient time
- Discuss your budget and savings expectations
Tip: Have your electricity bills ready. We need to see your annual consumption to properly size the system.
We visit your property to assess roof condition, solar orientation, shading, and technical feasibility.
What to Expect:
- Measure roof area and verify structural condition
- Assess roof orientation (south-facing is optimal)
- Identify shading from trees or buildings
- Inspect electrical panel and connection point
- Take photos and measurements for system design
Tip: Ensure your roof is accessible. Move any garden furniture or vehicles blocking access.
We create a custom solar system design optimized for your property and energy needs.
What to Expect:
- Size the system based on your electricity consumption
- Select premium quality panels and equipment
- Calculate annual solar production and expected savings
- Prepare detailed proposal with itemized costs
- Include ROI projections and payback period
Tip: Review the proposal carefully. Ask questions about warranties, maintenance, and system monitoring.
We handle all permit applications with local authorities and the electricity company.
What to Expect:
- Submit documentation to local town hall
- Apply for building permits if required
- Register system with regional energy authority
- Coordinate grid connection approval with Endesa
- Keep you informed of permit progress
Tip: This process varies by municipality. Marbella typically takes 2-3 weeks, rural areas may take 4 weeks.
Our certified team installs your solar panels, inverter, and monitoring equipment.
What to Expect:
- Day 1: Mount roof structures and install rails
- Day 2: Install solar panels and wiring
- Day 2-3: Install inverter, protections, and monitoring system
- Final system testing and safety verification
- Complete site cleanup
Tip: Plan to be home during installation. We'll need access to your electrical panel and may briefly cut power.
Final inspection by authorities and utility company approval for grid connection.
What to Expect:
- Municipal inspector verifies the installation
- Address any minor issues if needed
- Endesa installs bidirectional meter (if applicable)
- System connected to electrical grid
- Receive certification and complete documentation
Tip: Once approved, you can start generating electricity immediately. The bidirectional meter tracks excess sent to the grid.
We teach you how to use and monitor your new solar system.
What to Expect:
- Demonstrate the system monitoring app
- Explain how to read solar production metrics
- Review basic maintenance procedures
- Provide support contact information
- Answer all your questions
Tip: Download the monitoring app before our visit. We can set it up together.