HOW-TO GUIDE

How to Get Solar Permit in Marbella 2025Complete Step-by-Step Process

10-15 Days • €460-850 Total • 6 Simple Steps

Quick Summary

⏱️ Timeline10-15 days average approval, 13-20 days total process
💰 Cost€460-850 total (usually included by installer)
📋 Key Steps6 main steps: docs → assessment → apply → wait → BIE → grid connection

6-Step Permit Process

1Pre-Application: Gather Required Documents
1-2 days
€0

Collect all necessary documentation before starting the permit application process.

Obtain property deed (escritura) and IBI receipt
Get copy of catastro certificate showing roof dimensions
Prepare DNI/NIE and property owner authorization if different
Collect existing electrical installation certificates if available

💡 Pro Tip: If property has multiple owners, all must sign authorization. Missing signatures delay process 2-3 weeks.

2Technical Assessment by Licensed Electrician
2-3 days
€150-250 (usually included by installer)

REA-licensed electrician must survey property and design system to code.

Roof structural assessment and load capacity verification
Electrical panel inspection and compatibility check
System design meeting REBT electrical code standards
Technical drawings and single-line electrical diagram preparation

💡 Pro Tip: Only REA-licensed electricians can file permits. Verify license number at industria.gob.es before proceeding.

3Municipal Building Permit Application
1 day to submit
€60-150 depending on system size

File permit application with Marbella Ayuntamiento's Urbanismo department.

Complete Modelo 01 form for licencia de obras
Submit technical drawings and electrical diagrams
Provide proof of property ownership and authorization
Pay ICIO construction tax (or claim 95% exemption for solar)

💡 Pro Tip: Marbella has online portal (sede electronica) for permit applications - faster than in-person submission.

4Wait for Municipal Approval
10-15 days average
€0

Ayuntamiento reviews application for building code and urban planning compliance.

Municipality reviews technical documentation
Urban planning verification of aesthetic compliance
Structural safety assessment if required
Notification of approval or requests for modifications

💡 Pro Tip: Track status online with reference number. If no response in 45 days, permit is automatically approved (silencio administrative).

5Electrical Installation Certificate (BIE)
1 day after installation
€200-350

After installation complete, independent engineer certifies electrical safety.

Schedule inspection with certified industrial engineer
Engineer verifies all electrical work meets REBT standards
BIE certificate issued confirming safe installation
Certificate registered with Junta de Andalucía Industry department

💡 Pro Tip: Don't connect to grid before BIE issued - utilities can fine you and refuse connection.

6Grid Connection Authorization
5-15 days
€0-100

Utility company approves and connects your system to the electrical grid.

Submit connection request through BOE procedure
Provide BIE certificate and technical specifications
Utility installs bidirectional meter if needed
Final connection and system activation

💡 Pro Tip: Endesa usually faster (5-7 days) than other providers. Keep connection paperwork for subsidy applications.

Required Documents Checklist

Property Deed (Escritura)

Notary or property registry

€12-25 copy

IBI Property Tax Receipt

Ayuntamiento or online portal

Free

Catastro Certificate

sedecatastro.gob.es

Free

DNI/NIE

Current valid ID

Free

Owner Authorization

Notarized if representative

€30-50

Technical Project

REA electrician provides

Included

Electrical Diagrams

REA electrician provides

Included

BIE Certificate

Industrial engineer after install

€200-350

Common Problems & Solutions

Historic District Restrictions
Affects 15% of Marbella properties

Work with installer experienced in historic approvals, may need special panel types or placement restrictions

Potential Delay: +2-4 weeks
Community Property
Affects 30% of apartments/townhouses

Need community president approval first, then submit community minutes with permit application

Potential Delay: +3-8 weeks
Multiple Property Owners
Affects 20% of applications

All owners must sign authorization, get notarized power of attorney if some unavailable

Potential Delay: +1-3 weeks
Incomplete Technical Documentation
Most common rejection (40%)

Use experienced REA electrician who knows Marbella requirements, common mistakes include missing load calculations

Potential Delay: +2-3 weeks for resubmission

Complete Cost Breakdown

Municipal Permit Fee

Application submission

€60-150

ICIO Construction Tax

With permit

€50-200 (or 95% exempt)

Technical Assessment

Pre-application

€150-250 (usually free)

BIE Electrical Certificate

After installation

€200-350

Grid Connection Fee

Final connection

€0-100

Professional Permit Service

Throughout process

€300-500 (optional)

✓ Total: €460-850 (LIT includes all permit costs in installation price)

People Also Ask

Let Us Handle Your Permits

98% approval rate • Average 12 days • All costs included

Full Service

We handle everything

Fast Track

12 day average

Included

No extra charges

98% Success

Approval rate

Quote