Commercial Solar Mijas
Energy solutions for hotels, golf clubs and businesses
Sector Solutions
Features:
Case Study:
Features:
Case Study:
Features:
Case Study:
Features:
Case Study:
Consumption & Savings Analysis
| Business Type | Monthly Use | Current Bill | Solar System | Solar Production | New Bill | Monthly Saving | CO₂ Saved |
|---|---|---|---|---|---|---|---|
| 100-room Hotel | 80,000 kWh | €14,000 | 200kW | 52,000 kWh | €5,100 | €8,900 | 26 tons/month |
| 18-hole Golf Course | 120,000 kWh | €19,000 | 300kW | 78,000 kWh | €6,500 | €12,500 | 39 tons/month |
| Shopping Center | 150,000 kWh | €24,000 | 350kW | 91,000 kWh | €9,500 | €14,500 | 45 tons/month |
| Industrial Warehouse | 200,000 kWh | €30,000 | 500kW | 130,000 kWh | €10,500 | €19,500 | 65 tons/month |
Personalized Savings Calculator
Discover how much your business can save with solar
Financing Options
Incentives & Grants
Complete Grant Management
We handle all grant applications and tax reductions. We maximize your savings with all available incentives.
Frequently Asked Questions
Hotels in Mijas typically need 100-300kW systems. Golf clubs require 150-400kW. Restaurants need 20-50kW. Industrial units require 200-1000kW. We provide free energy audits to determine exact requirements based on consumption patterns and roof space.
Commercial solar in Mijas ranges from €800-1,200 per kW installed. A 100kW hotel system costs €80,000-120,000. Golf clubs (200kW) invest €160,000-240,000. Prices include professional installation, monitoring systems, and grid connection.
Mijas businesses typically see 20-35% annual ROI on solar investments. Hotels save €40,000-100,000 yearly. Golf clubs reduce costs by €80,000-150,000 annually. Payback periods are 3-5 years with current energy prices.
Yes, solar is ideal for golf irrigation pumps in Mijas. A 200kW system can power multiple 50HP pumps, saving €60,000-80,000 annually. We integrate with existing pump controls for seamless operation during daylight hours.
Commercial installations require: building permit from Mijas Ayuntamiento, grid connection approval from Endesa, environmental impact assessment (>100kW), and industrial registration. We handle all permit applications as part of our turnkey service.
Yes, we offer PPA (Power Purchase Agreements) and operating leases for commercial clients. Zero upfront cost options with immediate savings. Typical terms are 10-15 years with buyout options. Perfect for hotels and golf clubs wanting to preserve capital.
Reduce Your Business Energy Costs
Free energy audit and customized proposal within 48 hours