Case Study — Air Conditioning 2025

Mini-Split AC - Nerja Apartment

Single-zone A+++ inverter AC in a Nerja beachside apartment — quiet-series unit, REBT-compliant installation, and Boletín Eléctrico correcting a previous uncertified fit.

Nerja, Málaga April 2025Ben HaydenBy Ben Hayden
Nerja, eastern Málaga coast — beachside apartment air conditioning. Outdoor unit positioned to meet Nerja Ayuntamiento noise distance rules; Boletín Eléctrico issued on completion.
Nerja, eastern Málaga coast — beachside apartment air conditioning. Outdoor unit positioned to meet Nerja Ayuntamiento noise distance rules; Boletín Eléctrico issued on completion.

Project Overview

Location
Nerja, Málaga
Property Type
Air Conditioning
Service
Air Conditioning
Key Result
See the installation scope and equipment below; no financial outcome is promised.
—
Annual Production
—
Energy Savings
—
Annual Savings
—
Payback Period
—
CO₂ Reduction

The Challenge

The Nerja apartment had three wall-mounted splits installed in 2013 — each a different brand, none covering the dining area, and all running on R22 refrigerant that can no longer be legally recharged. One unit had already seized. The owners, who let the property short-term, were receiving guest complaints about heat in the dining room and poor cooling performance in the main bedroom. Any replacement needed to modernise the system, eliminate the R22 compliance risk, cover all spaces, and be achievable within the apartment without major structural work — the property is in a heritage-listed building in Nerja's old quarter.

The Solution

LG Dual Inverter V 2-zone mini-split system for compact apartment. 2x2.5kW wall units with Wi-Fi control and A+++ energy rating.

Technical Specifications

  • LG Dual Inverter V 2-zone system
  • 2x 2.5kW wall-mounted indoor units
  • Wi-Fi control via LG ThinQ app
  • A+++ energy efficiency rating
  • Ultra-quiet operation (19dB)

Our Installation Process

1

R22 System Assessment & Recovery

We used pressure testing and electronic leak detection to assess the state of each existing unit. Two were found to have minor refrigerant losses; all three were removed and the remaining R22 recovered by our qualified engineers using certified recovery cylinders. Complete refrigerant records were issued to the building administrator as required under EU Regulation 517/2014.

2

Heritage Building Installation Constraints

The building's heritage listing prohibited visible external condensing units on the street façade. We resolved this by positioning both new condensing units on the apartment's rear terrace, shared with one other apartment owner. Refrigerant line sets were routed through the building's existing service void — no new penetrations through listed masonry were required. All cable runs were concealed in period-matching white mini-trunking.

3

4-Zone Installation Including Dining Room

Four Panasonic Etherea wall-mounted units replaced the three ageing splits, adding coverage for the dining area that had previously been unserved. Unit placement was optimised for airflow distribution in each room, avoiding draughts over seating areas. Each unit was connected to its own RCBO on the existing consumer unit — a safety requirement often skipped by budget installers.

4

Smart WiFi Setup for Remote Landlord Control

Each unit was configured with Panasonic's wireless LAN adaptor, allowing the property owner to control temperatures remotely via the Comfort Cloud app. This allows the owner to set a 'between-guests' temperature of 26°C while the apartment is vacant (preventing unnecessary running) and to pre-cool to 22°C 30 minutes before each guest check-in. The app also provides real-time energy monitoring per unit.

Results

See the installation scope and equipment below; no financial outcome is promised.

Backed by Research

References for checking the proposed design. These sources do not certify this project's performance, savings, eligibility or commissioning records.

Assess airflow, capacity and compatible controls

Inverter operation and zoning can adjust output to demand, but do not guarantee a fixed percentage saving. Airflow, installation, setpoints, occupancy and maintenance affect results. Refrigerant work must meet current applicable requirements; do not assume a universal insurance outcome.

BOE — RITE: applicable thermal-installation requirements ↗
Holiday lets in Nerja create a specific AC challenge — the system needs to perform at the same standard whether the owner is in residence or a guest is checking in having never seen the controls. We always specify a remote access solution, set meaningful temperature limits (guests cannot set below 18°C or above 30°C to prevent extremes and bill shock), and hand over the property owner a separate admin-level app login. A guest complaint about the AC at 11pm usually has a solution that takes 30 seconds remotely.
Rob Greaves
Rob Greaves
HVAC Director, LIT Electricians SL

Frequently Asked Questions

About the Author

Ben Hayden
Ben Hayden
English-Speaking Electrician & Independent Energy Advisor

Ben Hayden is an English speaking electrician and independent energy advisor based in Marbella, Spain, with over 15 years of electrical experience across Europe. He provides independent energy and electrical checks for overseas property owners and managers across the Costa del Sol — helping clients cut electricity bills, navigate Spanish regulations, and make confident decisions on solar PV, heat pump, EV charger and battery storage projects. Ben advises in plain English on projects where the paperwork is in Spanish and the stakes are high. His writing has appeared in ExpatArrivals, The Olive Press, Euro Weekly News, BuildingTalk and pv magazine.

    We Respect Your Privacy

    Optional visit and advertising measurement needs your permission. Change your choice anytime in the footer.